Close
OPENING HOURS

Monday to Saturday: 8am – 5.30pm

ADDRESS

Offices: No 16, D18 Street, Phuoc Long B Ward, Thu Duc City, Ho Chi Minh City, Viet Nam

Services

PLUMBING SYSTEM

The drainage system in a construction project includes the following main components:
Potable water supply system: This includes pipes, valves, and fixtures to supply clean water from the source to various points of use within the building.
Wastewater drainage system: This consists of pipes, fittings, and manholes to collect and receive wastewater from sinks, showers, toilets, etc., and to convey it out of the building.
Stormwater drainage system: This includes pipes to drain rainwater from roofs, balconies, and impermeable surfaces.
Equipments: Such as sanitary, water pumps, control valves, safety valves, water storage tanks, etc.